Compare Overload Tab


The Compare Overload tab indicates how much work was performed in excess of resource availability on each day of the project. 



For example, the table above indicates that on 10/26/2003 working the Original schedule would require 14.75 man-hours of over-allocation while on the same day the PSOP schedule required no over-allocation. Thus, as is shown in the improvement column, the PSOP schedule has improved the over-allocation by 14.75 hours on 10/26/2003.

There may be days on which the PSOP and Original schedules have the same amount of over-allocation. For example, the table above indicates that neither schedule required any excess resources on 10/23/2003. Checking the Only Differences box below the table will hide such rows, showing only those dates where the amount of overload in the PSOP and Original schedules differ.

Selecting a resource from the resource box below the table will cause the table to show overload statistics for only the selected resource. If "Cumulative" is selected total overload for each day is shown.

Previous Next