Products
>
PSOP
>
Documentation
Frequently Asked Questions
General
How can I get the most out of PSOP?
Why do I have to close P3e before I run PSOP?
Why do I have to make sure nobody else has the project open?
Issues with the original schedule/project
PSOP says my original schedule is in an inconsistent state. What does that mean?
Why does PSOP say my finish date is impossible?
PSOP says it may be impossible to achieve the same duration/overload as my original schedule. Why?
How come the PSOP schedule is longer than my original schedule?
How does PSOP handle relationships to activities in other projects?
Why aren't my "As Late as Possible" activities placed later in the schedule?
Interpreting PSOP results
Why are the PSOP usage plots different from the P3e plots?
Why does PSOP show more overload that P3e on the same schedule?
Why aren't availabilities shown in cumulative plots?
Why don't the results show all the work on my project?
Why are there solid black bars in the resource usage plot?
Troubleshooting
How come P3e isn't responding to PSOP's scheduling request?
Why did my P3e schedule change?
Why does PSOP say I'm out of logins?
Why does PSOP say my project changed during leveling?
Why can't PSOP connect to the Primavera database?
Why do my Level of Effort activities have a longer duration than necessary?