 |
|
|
 |
Products > PSOP > Documentation
How come the PSOP schedule is longer than my original schedule?
A PSOP schedule is considered better if it has less
over-allocation than the original schedule. PSOP will make the schedule
longer if it reduces over-allocation and doesn't violate the leveling options. If you do not want PSOP to make the schedule longer use the leveling options to limit the schedule length PSOP will produce.
Back to FAQ
|
|
 |
|