 |
|
|
 |
Products > PSOP > Documentation
Why does PSOP show more overload
than P3e on the same
schedule?
P3e aggregates total availability and total usage in a way that can
hide actual over-allocation. See the previous FAQ entry
for details.
P3e ignores roles when leveling and calculating overload. If PSOP is leveling using roles (more information...)
the information it calculates will be for roles and not resources. This
can result in dramatically different plots and statistics.
Back to FAQ
|
|
 |
|