Products > PSOP > Documentation
Why does PSOP show more overload than P3e on the same schedule?

P3e aggregates total availability and total usage in a way that can hide actual over-allocation. See the previous FAQ entry for details.

P3e ignores roles when leveling and calculating overload. If PSOP is leveling using roles (more information...) the information it calculates will be for roles and not resources. This can result in dramatically different plots and statistics.

Back to FAQ